Tele Energy Sensor Mains & System Protection, 3 Phase, DIN Rail

Bulkkorting beschikbaar

Subtotaal (1 eenheid)*

€ 423,67

(excl. BTW)

€ 512,64

(incl. BTW)

Add to Basket
selecteer of typ hoeveelheid
Op voorraad
  • 28 stuk(s) klaar voor verzending
Heeft u meer nodig? Klik op 'Controleer leverdata' voor extra voorraad en levertijden.

Aantal stuks
Per stuk
1 - 4€ 423,67
5 - 9€ 410,96
10 +€ 398,25

*prijsindicatie

RS-stocknr.:
266-4272
Artikelnummer Distrelec:
302-96-431
Fabrikantnummer:
NA003-M64
Fabrikant:
Tele
Zoek vergelijkbare producten door een of meer kenmerken te selecteren.
Alles selecteren

Merk

Tele

Product Type

Energy Sensor Mains & System Protection

Electrical Phase

3

Mount Type

DIN Rail

Terminal Type

Screw

Minimum Operating Temperature

-15°C

Maximum Operating Temperature

65°C

Width

107mm

Standards/Approvals

No

Height

91mm

Length

62mm

Series

RE

Vrijgesteld

Land van herkomst:
AT

TELE Grid & System Protection Relay, Frequency & Volatage Monitoring for Alternative Power Generation


One grid & system protection for worldwide use and all standards in one device. When operating alternative power generation, grid and system protection is required by law and disconnects the power generation system (photovoltaics, generator, battery buffer) from the grid in the event of a power failure. This ensures the safety of the distribution network, machines and people;In case of a pre-defined state of grid failure the grid and system protection separates the energy generator (photovoltaics, generator, battery buffer) from the grid. Its function is very important for the reliable protection of the power grid and generating plants because it ensures that the connection of an energy generator does not impair the function or safety of the distribution grid.

Features and Benefits


TELE’s grid & system protection NA003-M64 consists of two components:

Protection relay that measures the grid voltage and grid frequency. It also contains the actual protection functions and generates the signal for grid disconnection.

1-2 tie switches that ensure the actual disconnection from the mains.

For high availability of the supply network, short-term grid disturbances must not separate the generators from the grid. This function, called Fault Ride Through (FRT), refers in particular to short-term undervoltages and overvoltages. Depending on the type and power of the energy generator, different requirements apply, those can be adjusted via the parameterisation of the NA003-M64.;One device for local & international markets

Easy handling for service personnel and commissioning engineers

Pre-configured parameter sets for different countries in Europe & worldwide

Individual solutions can be implemented through a variety of configuration options

Integrated FRT (Fault ride through)

Replaces older devices without changes in the control cabinet due to design and availability of older certificates.

Standards Include


OVE TOR R25 NS SYNC; OVE TOR R25 NS ASYNC; OVE TOR R25 MS SYNC; OVE TOR R25 MS ASYNC; OOE TOR R25 NS SYNC; OOE TOR R25 NS ASYNC; OOE TOR R25 MS SYNC; OOE TOR R25 MS ASYNC; W TOR R25 NS SYNC; W TOR R25 NS ASYNC; W TOR R25 MS SYNC; W TOR R25 MS ASYNC; TIROL TOR NS SYNC; TIROL TOR NS ASYNC; TIROL TOR MS SYNC; IROL TOR MS ASYNC; VDE-AR-N 4105:2018-11; VDE-AR-N 4105:2018-11; VDE-AR-N 4105:2018-11; VDE-AR-N 4110:2018-11; CEI 0-21:2019; G99/1/3 LV:2018; G99/1/3 HV:2018; G98/1/2:2018; C10-11 2019 LV-IP; C10-11 2019 LV-ASS; C10-11:2019 HV-IP; C10-11:2019 HV-ASS; NA/EEA- CH 2014; NA/EEA-NE7 - CH 2020; NA/EEA-NE7 - CH 2020; EN 50549-1:2019 LV; EN 50549-2:2019 HV; EN 50438:2013 (DK); VDE 0126-1-1:2013 (FR); AB AS 4777.2:2020; C AS 4777.2:2020; NZS 4777.2:2020; NRS 097-2-1: 2017; EN 50438:2013; E 8001/8101; VDE 0124-100:2013; TR3 Rev23:2013; AS/NZS 4777.2:2015; G59/3/3:2015 LV; G59/3/3:2015 MV; G83/2:2012; C10-11:2012 LV; C10-11:2012 MV; C10-11:2019 LV-IP; C10-11:2019 HV-IP; As well as an OPEN SETUP

Gerelateerde Links